![]() He anticipates construction could start in the fall and take about 18 months. The new, 16,000-square-foot building will provide enhanced security, appropriate technology and evidence storage, facilities for female deputies, witness and victim interview rooms, and appropriate workspace for deputies working to respond to public safety needs.įletcher said the township has a design in hand for the new building and now will spend "the next couple of months" finalizing those plans before seeking bids, possibly by the end of summer. "It would cost too much money just to fix (problems with the building)." Definitely, this building was at the top of the list," Fletcher said. "The past couple of years, we've been doing a review of buildings and facilities. About 40 employees, including deputies, work out of the station. The current 7,000-square-foot substation, 7736 Administration Road, was built in 1982 and is the base of operations for the Delta Township Patrol, which serves the township's approximately 33,000 residents. "(The building) needed to be replaced for a while." "We're very pleased with the result," Delta Township Supervisor Ken Fletcher said. It will cost the owner of a home with a taxable value of $100,000 about $112 a year. The proposal was for 1.12 mills for 10 years, and with 100% of precincts reporting, 56% of voters cast yes ballots (3,303), according to unofficial results, while 44% of voters (2,570) opposed the proposal. ![]() LANSING - Delta Township voters approved a $16 million proposal for a new public safety facility that will more than double the size of the current space occupied by the Eaton County Sheriff's Office substation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |